The Norfolk Broads Forum / Ask JP 5 / Electric Charging Pillars
login
join
Graphics Off
Search
Forum Members - Book your Hoseasons holiday today, Just call 0345 498 6296

This is a moderated forum Reply to this DiscussionReply to Discussion | Start new discussionNew Discussion << previous || next >> 
Posted By Discussion Topic: Electric Charging Pillars

Similar Threads That Might Help :
electric card charges| Hire charges| Charging on Broads?| Mooring charges....| boatyards could lower their hire charges!| Information about our Mooring Charges|

book mark this topic Printer-friendly Version  send this discussion to a friend  new posts last

JP
Nov-23-2018 @ 4:31 PM                           Permalink
reply
edit
profile
send p.m.
Forum Regular
Posts: 222
Joined: Dec 2005
JP
          

Add To Ignore List
Dear Annville,

Thank you for the questions.

Q1. What is the cost of an electric post/tower. (Unit cost and the total cost including unit and installation)?

Total Cost of Pillar including accommodation works is around £1700.

Q2. What is the  average cost per linear meter for each supply from the grid to each mooring location?

UK Power Networks have to provide all the excavation and the connection time to the mains and charge between £100 and £300 per metre. This can include provision of new transformers, working at height and connection to pylons etc. Other contractor costs per metre to install cable in a ducted trench are approximately £35 per metre depending on the site and surfacing.

Q3. Does the BA intend to increase the number of electric points/moorings, If yes, what time scale is there to increase them?

We would love to install more – the constraint is finance. Historically we have added 2 to 3 pillars per year to our network. This has sometimes been to extend the numbers of pillars on one site or to start a new installation on another. Today the Broads Authority has agreed to install pillars at the Acle Bridge moorings funded by an increase in tolls.

Regards

John


annville
Nov-24-2018 @ 12:27 PM                           Permalink
reply
edit
profile
send p.m.
Lives to Post
Posts: 1284
Joined: Oct 2013
          

Add To Ignore List
Thank You for your reply John Does this mean £1700 for each meter ie 3x £1700 or is this the isolated cost for one meter as at Rockland  where there is only one meter, What will the total cost be for meters at Acle be please .John



This message was edited by annville on Nov-24-18 @ 6:02 PM

Marshman
Nov-24-2018 @ 3:17 PM                           Permalink
reply
edit
profile
send p.m.
Mardles sometimes
Posts: 4044
Joined: Oct 2006
Marshman
          

Add To Ignore List
RE Surlingham - is this meter on the BA mooring on the Postwick side or in the pub garden? If the latter I suspect it is not a BA post but belonging to the pub - or perhaps not???


Home Photo Gallery Days Afloat Contact Us
Chat Room Downloads Norfolk Broads @ Amazon Make My Logo
Shops & Businesses Members Gear Norfolk Broads @ EBay Holiday Calendar
Pub Guide Tide Tables SOS List Popular Threads
2017 Calendar Contest Make A Donation Links Hireboat Info
Norfolk Broads @ CafePress FAQ Broads Quiz Forum Events
Advertise With Us Forum Shop Boating Bits Stickys and FAQs Boating Bits Hirecraft List

 

 

 



Copyright © 2005 Y2KInternet, All Rights Reserved.